Saturday afternoon was stunningly beautiful and warm. Warm for the mountains in Montana. A great time for being outside to work on the new studio. This object of work was to install the tubing for the radiant heat concrete floor. This is the last step before the slab pour and getting the frame up! Yay!
I hadn’t installed one of these for several years. The work was quick and smooth . The best new add to the method was the spinner for the Pex tubing which kept in from unfurling out of control. The greatest assistant ever…Noel who patiently watched and waited for me to throw the ball for her.